When Ardmac were tasked with fully refurbishing an office block in the city centre of Manchester, they knew that they wanted to capture the works going on behind the scenes.

We were brought in when the building had been stripped back to its core, and we then installed two fixed cameras.

These allowed for continuous capture of the works undertaken on site, allowing key details to be placed in the final time lapse video.

Along with these fixed cameras, we also made multiple visits to site to capture key events.