When working on our second project for Highways England, we were tasked with capturing a 3-day bridge installation over the M49 Motorway.
Whilst the motorway was closed, four beams were lifted into place on the bridge. Decking was then placed, allowing for a safe working area once the motorway reopened.
Due to the multi-day nature of the build, we setup one fixed camera for the duration.
Alongside this we also dispatched a cameraman to capture multiple angles of the works, focusing on key details of the installation.
- CLIENT Highways England
- YEAR 2019
- CATEGORY construction